KNX switch vs shutter actuators: when to separate the families
A decision table for when lighting and blind/shutter loads need separate KNX actuator families — plus when a switch/shutter combo module is still the right BOM choice.
July 24, 2026
Practical guides on actuators, power & topology, and procurement — written for tenders, then connected to the Smartanix catalog when you buy.
Browse guides
Each category is a guide collection — open one to see related articles. Use level to match Beginner through Expert. Shop the catalog when you are ready to procure.
Featured category
KNX Actuator Guide
From load maps and selection matrices to spare capacity, thermal derating, Data Secure, and multi-brand order codes — guides for commercial actuator tenders.
Browse Actuators guides →
Categories
Level
Topics
8 articles published
A decision table for when lighting and blind/shutter loads need separate KNX actuator families — plus when a switch/shutter combo module is still the right BOM choice.
July 24, 2026
A copy-paste actuator selection matrix for commercial KNX tenders — score each shortlist row on load type, channel plan, spare capacity, and Data Secure before the BOM freezes.
July 23, 2026
A practical guide to KNX line topology for mid-size commercial projects — floor lines, function-based lines, IP backbone design, and cabinet star layouts — with coupler placement rules, diagrams, and a tender checklist.
July 20, 2026
A copy-paste tender BOM field template — nine columns that keep function, brand, order code, qty, spare, and notes aligned when ABB, Schneider, Interra, and others share one quote.
July 15, 2026
A reusable line current budget table, spare-capacity rules, and a worked mid-size commercial example — so you size 160 / 320 / 640 mA supplies before the BOM freezes.
July 12, 2026
How integrators shortlist switch and shutter actuators before the BOM freezes — by load, channels, and brand mix.
July 10, 2026
A repeatable BOM workflow for integrators who mix ABB, Schneider, Interra, and more in one KNX job.
July 8, 2026
A practical current budget method for choosing 160 mA, 320 mA, and 640 mA KNX supplies before you order.
July 5, 2026